Simple cathodic electrophoretic coating line equipment composition and quotation
Time:2012-10-22 11:48:53

1. Technological process:

       Online pre-cleaning - pre-degreasing - degreasing - water washing 1- water washing 2- table adjustment - phosphating - water washing 3- cycle pure water washing - pure water washing 1- electrophoresis - tank ultrafiltration water washing -UF1 water washing 2- off lines-degreasing - drying


2. Main Design basis:

       The maximum length of the workpiece is 3.7 meters, the tank size is 6.5×3.5×2.7, the step-type (intermittent type), the annual working day is 320 days, the full work day is 20 hours, the normal production beat is 6 minutes, the annual designed production capacity is 38400. Due to the use of step-type production, considering the current auxiliary materials, the production tempo can only be adjusted to 5 minutes at most. If the emphasis is given to the possibility of production expansion, the length and height of tank can be appropriately relaxed, so as to increase the number of electrophoretic pendant per unit and increase the productivity by multiples.


       The prices in the table below are all made of ordinary hot rolled steel plate or pipe, and the filter is made of stainless steel. The price of 10mm plate is 4500 YUAN/ton. If the use of stainless steel, the market price of 316 stainless steel plate 29.5 yuan/kg, 125 pipe material 39 yuan, the cost is expected to increase at least 3 times.

3. Main Precautions for equipment installation:

       1) Channel: 6-10mm ordinary carbon steel plate is lined with epoxy FRP 4-6mm, external I-steel or channel steel frame, joints are fully welded, internal corners are curved. Base 150-200mm I-steel. Each tank shall be lined with fiberglass. The electrophoresis tank shall be resistant to dry pressure of 2W.

       2) Pumps: Double-mechanical sealed stainless steel pumps are used for electrophoresis and UF1 washing, with a speed of 1450 and a flow rate of 120m /H. Main spare parts are available. Other tank pump, can be used ordinary acid and alkali pump, flow of 100T, inlet with filter screen, pipe filter.

       3) Filter: Electrophoresis tank using 6 bags filter, and circulation pump flow matching, filtration accuracy of 50 m.

       4) Rectifier system: voltage fluctuation rate is lower than 5%, adjustable from 0 to 350V, the rated current shall be determined according to the maximum size of electrophoresis workpiece, generally 1200A can meet the requirements.

       5) Ultrafilter and pure water device, determine the penetration and water production amount according to the production beat and workpiece size.

       6) Liquid cooling and insulation in the electrophoresis tank: start the refrigeration unit in summer. If the winter temperature is low (below 10℃), the workshop must keep warm; otherwise, the heating system must be added to the electrophoresis tank liquid.

       7) The specific number of anode tubes shall be adjusted according to the actual size of the workpiece to ensure that the pole ratio is 1:4. If the product type of electrophoresis is not fixed, it is suggested that the number of electrode tubes can be adjusted.

       8) Hanging tools: The specific quantity of hanging tools shall be adjusted according to actual production needs, and the hanging tools shall be treated with acid and alkali resistance in advance. It can be processed by electrophoresis in the trial production stage and dried for standby use.

       9) The estimated price of the main purchased equipment at the electrophoresis station (inaccurate) : 100,000 yuan for pure water treatment equipment, 100,000 yuan for anode system, 100,000 yuan for ultrafiltration system, 100,000 yuan for refrigerating unit including cold water tank, 50,000 yuan for tank body, 50,000 yuan for support i-steel or channel steel, 50,000 yuan for valve pipe and flow meter, 50,000 yuan for rectifier cabinet and 50,000 yuan for manual welding material.


4. Special Notes:

       This scheme is mainly prepared for the purpose of controlling investment. Therefore, the operation and process management in the later stage are bound to increase the corresponding cost, and some seemingly unimportant performance is also missing.


       1) Material selection: ordinary carbon steel with protective coating is adopted instead of all stainless steel. Therefore, we must pay attention to the management in the future, such as the selection of coating materials (pretreatment, electrophoresis), not the selection of strong acid and alkaline products; In the process control also need to pay attention to related matters.

       2) No complete closure. Generally, electrophoretic coating lines are completely sealed for several purposes. The first is to ensure that the liquid in each tank is not polluted by the outside world; the second is to prevent the acidic substances on the electrophoretic coating line from polluting the outside world; the third is to prevent the liquid splash damage equipment, etc. However, such hazards can also be minimized if environmental controls are strengthened in the construction of the workshop, management is strengthened in the production process, and attention is paid to the selection of materials. When the production is stopped, proper covering shall be carried out for each tank.

       3) In the selection of equipment, it is suggested to choose the most cost-effective products and the most perfect after-sales service as far as possible. It is also suggested to do so in the future selection of materials, which is conducive to the on-site process management.

       4) For the electrophoretic coating line in this scheme, as long as the management is perfect and the personnel operate normally, the normal production can be guaranteed for more than 6 years. If it can be more than 10 years, daily management is needed to cooperate.

       5) As the installation of electrophoretic coating line equipment is a system project, it is recommended to make relevant plans in advance, and check and confirm the equipment step by step according to the agreement with the equipment installation company, so as to ensure the quality.

Service hotline

020-36860788

WeChat

Feedback

Feedback

免费观看交性大片| 国产乱妇乱子视频在播放| 巨乳人妻久久+av中文字幕| 99尹人香蕉国产免费天天| 人妻无码久久精品人妻| 国产精品一区二区久久| 亚洲午夜无码久久久久小说| 2021亚洲va在线va天堂va国产| 国产精品久久久久高潮| 狠狠人妻久久久久久综合| 18禁成年免费无码国产| 日韩精品一区二区三区在线观看 | 色欲香天天综合网站| 亚欧成a人无码精品va片| 国产成人亚洲精品无码影院bt| 人人做人碰人人添| 99精品丰满人妻无码a片| 国产婷婷色一区二区三区在线| 老鲁夜夜老鲁| 亚洲日产韩国一二三四区| 成熟妇女性成熟满足视频| 亚洲中文字幕av每天更新| 97人洗澡从澡人人爽人人模| 婷婷色婷婷开心五月四房播播久久| 日本精品高清一区二区| 又白又嫩毛又多15p| 人妻丰满熟妇ⅴ无码区a片| 亚洲乱亚洲乱妇无码麻豆| 欧美 国产 综合 欧美 视频| 精品无码专区毛片| 亚洲色欧美在线影院| 真实国产乱啪福利露脸| 精品久久久99大香线蕉| 国产无遮挡18禁无码网站| 国产福利在线永久视频| 久久精品国产清高在天天线| 国产精品久人妻精品| 乱色熟女综合一区二区三区| 欧美高清一区三区在线专区| 国产丶欧美丶日本不卡视频| 国语对白刺激在线视频国产网红|